How the ASS works®- Prime 2

At ASS®- Prime 2 essentially the construction, inflation and pipe weld purging remain the same as with the ASS®– Prime 1. The difference lies in the Gas routingThe pipe weld purging gas is fed through a second hose up to the Secondary Bag guided and there evenly into the sintered metal via Pipe weld purging chamber introduced.

From there, the shielding gas flows towards Primary Bag, displacing the remaining oxygen and becomes drained anteriorly. The gas flow therefore runs from secondary to primary – in other words, in the opposite direction to the conventional design. Inflation and purging times remain unchanged.

All ASA®– Prime applications at a glance

In addition to the application shown here, our ASS®– Provide six further possible applications for various purging tasks in pipeline construction. The overview page compares all seven possible applications compactly – allowing you to find the right solution straight away.

Product & price enquiry

Ask your question or request a non-binding offer.

REQUEST A FREE CONSULTATION