How the ASS works®– Prime T-piece

After positioning, the two forming bladders in the main pipe as well as the additional purging bladder in the Junction inflated. This seals the entire T-zone and creates a closed Forming chamber educated.

The forming gas flows into the chamber, distributes itself in the main pipe and then rises into the branch. In the process, the residual oxygen is displaced and [discharged] via the designated Exit points with sintered metal controlled exhaustion. Depending on the installation situation, the forming gas can be exhausted forwards or backwards. In this way, all relevant weld seam areas on the T-piece can be reliably purged. The purging time remains roughly at the level of a comparable ASS®– Prime 1 Systems.

All ASA®– Prime applications at a glance

In addition to the application shown here, our ASS®– Provide six further possible applications for various purging tasks in pipeline construction. The overview page compares all seven possible applications compactly – allowing you to find the right solution straight away.

Product & price enquiry

Ask your question or request a non-binding offer.

REQUEST A FREE CONSULTATION